1:Project Name: RTC Tower Roof Repair / Maintenance, RFP FD22-049

 Project Location: 2249 Argonne Ave, Long Beach, CA 90808

SOW: Fixing Handrails, Spalling of concrete of floors, Installation of new roof 

Project Owner: City of Long Beach Fire Department, Pat.Hachtel@longbeach.gov, Office: 562.570.2571

Start date : 09/14/2022  completion date : 10/14/2022

2.Project Name: CIP NO. 22-9621 – Police Department Restroom Renovations

 Project Location: 505 Forest Ave, Laguna Beach, California 92651

Project Engineer: Mark Trestik

Project Owner / POC: City of Laguna Beach Public Works, Thomas Perez – Captain Program Manager, tperez@lagunabeachcity.net

 Start date: October 17, 2022 Scheduled Completion: December 2022

B-Commercial Projects 

1:Project Name: Dog Day Care Remodeling

Project location: 6901 Warner Avenue, Huntington Beach, CA 92647

Scope of Work: Preparing design drawings& construction off the storage, Washing Drying Room, Grooming room, large Dog Kennels, Break Room

Client: Jomid Corporation  Email : (Keshav@jomidtech.com), Cell # 001 949 521 1430

2:Project Scope: Soft Story Retrofit of a two-story apartment building with Tuck under parking, using steel moment frames

Location: 4228 S Degnan Blvd, Los Angeles, CA 90008

3:Project Scope: Soft Story Retrofit of a two-story apartment building with Tuck under parking, using shear wall

Location: 5229 Harmony Ave, North Hollywood, CA91601

4:Project Scope: Soft Story retrofit of a three-story apartment building with tuck-under parking using hardy Frame & steel moment Frame 

Location: 2332 S Beverly Glen  Blvd, Los Angeles, CA 90064

5:Soft Story of a two-story apartment building with tuck under using ordinary moment frames 

Project address: 14207 Delano St, Van Nuys, CA 91401

6:Soft Story of a two-story apartment building with tuck under using ordinary moment frames & Hardy Frames 

Project Location:252 N Bonnie Brae St, Los Angeles, CA 90026

7: Tenant Improvements (Design drawings Permit & Construction )

Project Location: 2027 West 7 the street LA 90057

Scope of Work (wood plastic composite flooring with foam underlayment, New storefront, New HVAC, New Acoustical Tile, New electrical, New plumbing )

Client: Bilak Building Company, LLC, Email:smoaven@dolmarinc.com, Phone# 310-614-0234

8: Tenant Improvements (South Coast Pet Hospital  )

Project location: 3752 S Bristol St, Santa Ana, CA 92704

SOW: Design drawings, New partition walls, New ADA restrooms, Fire sprinkler relocation, HVAC, Plumbing, Electrical

Client: Jomid Corporation  Email : (Keshav@jomidtech.com), Cell # 001 949 521 1430

Please see below the link to the drawings,

Existing Floor PlanProposed Floor Plan

9: Retrofit to existing building using (2) special cantilever  Columns 

Project location: 5049 Laurel Canyon Blvd, Valley Village, CA 91607

10: Landscape & hardscape 

Project location: 405 Venice Blvd overpass (Globe Ave/Tuller Ave)

rendering drawings

11: Building new loading dock 35’x18′, Handicapped Parkings, New concrete paving, storage, and fence (ongoing )

Project location: 15503 3/4 S Main Street, Gardena, CA 90248

12: Retrofit to existing building using (2) special cantilever  Columns & 2 Hardy Frame

Project location: 238  N Bonnie Brae St, Los Angeles, CA 90026

13: Retrofit to existing 46 units 4 story apartment building using (2) special moment frames 

Project location: 122 S Street Andrews Place, Los Angeles, CA 90004

14: Retrofit to existing 28 units 3 story apartment building using (8) Cantilever columns

Project location: 1523 N Fuller Ave, Hollywood, CA 90046

15: Soft Story Retrofit Using Special Moment Frame, Shear Walls, and Cantilever Column for 96 units apartment building( On Going)

Project location: 17550 Burbank Blvd, Encino, CA 91316

16: Soft Story Retrofit Using Special 22 New Cantilever Column for 56 units apartment building (On-Going )

Project location:  258 S Serrano Ave, Los Angeles, CA 90004

17: Soft Story Retrofit Using Special using  Cantilever Columns 

Project location: 11531 Culver Blvd, Los Angeles, CA 90066

18: Soft Story Retrofit Using Special   Cantilever Columns (on Going)
Project location:7130 W Hollywood Blvd, Los Angeles, CA 90046
19: Soft Story Retrofit Using Special  Cantilever Columns & Shear Wall(On-Going )
Project location:1661 259th st, Harbor City, CA 90710
 
20: Design & Construction of New Trash Enclosure

Project Location: 12980 Foothill Blvd, San Fernando, CA 91342

21: Soft Story retrofit to existing building using 4 unique cantilever column systems (On-Going )
Project location:5105 Woodman Ave, Sherman Oaks, CA 91423
 

22: Soft Story retrofit to existing building using 3 unique cantilever column systems (On-Going )
Project location: 347 N OAKHURST DR Beverly Hills,CA 90210
 

C-Residential  Projects

1:Project SOW: Addition to single-family Dwelling( addition of a 300 SF  foyer with large bay windows )

Project location: 3464 Hightide Dr, Rancho Palos Verdes, CA 90275

2:Project SOW: Remodeling the whole house  

Project location: 134 Avenida Majorca, Unit A, Laguna Woods, CA 92637

3:Project SOW: Sunroom On the second floor 

Project location: 19961 Glenhaven Dr, Yorba Linda, CA 92886

4:Project SOW:  Interior Remodeling 

Project location: 148 S Crescent Dr, Beverly Hills, CA 90212

5:Project SOW: Design & Construction for replacing 3 story multi-family apartment building columns